SUPPLY TRACK RECORD - TRANSMISSION LINE TOWERS

TOWER - LOCAL


No. Contract reference Date Customer End user Location Voltage Length of Line(km) Tonnage
500KV 275KV 132KV 33KV OPGW MT
1 102/2009 2009 HGPT TNB 132kV TL Double Circuit Papan to MengLembu  132     6.8   7.5 183
2  266/2007 2007 Multi Discovery TNB Proposed 132kV Single Circuit TL Loop In/Out Into PMU Kg. Repah From Existing Kg. Gadek-Kelemak 275   12     12 288.72
3 707/2007 2007 HGPT TNB 132kV TL Bukit Beruntung-Ulu Yam-Proton City-Slim River to DC 282MVA 132     61   61 1137
4 851/2006 2006 HGPT TNB 132kV Double Circuit Transmission Line From Point X (AP26A) To PPU Tg. Gemok-Mainhead B 132     30   30 648
5 833/2006 2006 HGPT TNB Proposed 132kV Double Circuit Transmission Line From Pmu Mersing 132/11kV To Point X (AP26A) Mainhead A 132     30   30 648
6 25/2005 2005 TTSB TNB 275kV High Capacity TL Kelemak To Melaka 275   20     20 890
7 310/2005 2005 HGPT TNB 275kV (1000MVA) TL From Paroi to Lenggeng 275   27     27 1950
8 45/2005 2005 HGPT TNB 275kV and 132kV TL Termination at PMU Rantau Negeri Sembilan 275   3 1   4 2730
9 20/2005 2005 HGPT TNB 275kV High Capacity TL Bukit Raja Shah Alam West 275   7     14 500
10 606/2003 2003 Transpro TNB Design, Construction, Deviation and Dismantling Works for Implementation of 132kV & 275kV DC TL Semabok & Ujung Pasir 132   1     1 30
11 Powertek 01:0001/2001 2001 HGPT Powertek Berhad 275kC DC & 275kV132kV QC Powertek to Kelemak 275/132 & 132   23 16   23 1490
12 2/2001 2001 HGPT TNB   275   7     7 390
13 DN 2/2000 2000 Mahkota Technologies SESB, Sabah Sabah West Coast Grid Extension 275/132, 275, 132 & 33   105 60 10 175 2380
14 277/2000 2000 HGPT TNB Rehabilitation Project for 132kV Transmission Line Package 2 Perak. 132     30   30 1040
15 146/2000 2000 HGPT TNB Implementation of 132kV DC TL From Point X to Avetani Substation 132     7   7 320
16 314/2000 2000 HAKIKAT TNB Upgrading 132kV Papan-Pengkalan-Gopeng Road Transmission Line 132     11     620
17 T.3927 2000 HGPT SESB, Sabah Design, Manufacturer, Delivery, Installation, Testing and commisioning of 33kV Interconnecting Between Sandakan 132/33kV Main Intake S/S and Taman Tsun Nyen S/S Sandakan 33       7 7 250
18 257/2003 2003 HAKIKAT TNB   275           100
19 255/98 1998 HGPT TNB Implementation of 275kV & 132kV TL Projects for Transmission System Development 1997-Stage 2  132     55   55 1290
20 300/98 1998 HGPT TNB Implementation of 33kV Distribution Line Project for Pahang Darul Ehsan 33           250
21 877/97 1997 HGPT TNB Supply and Erect 275kV & 132kV TL for TNB Transmission System Development - Mainhead A & C 275/132, 275 & 132   100 72   172 5640
22 116/96 1996 HGPT TNB Distribution Network for 33kV Overhead Lines in Johor from Pasak to PPU Tenggaroh 33       60   540
TOTAL   0 305 379.8 77 683 23314.720