| No. |
Contract reference |
Date |
Customer |
End user |
Location |
Voltage |
Length (km) |
| 150KV
| 275KV |
132KV |
OPGW |
| 1 |
9301-00 |
2009 |
BBUG |
Pwerlink, Queenland |
E Series Towers for South Pine East 275kV TL |
275 |
|
|
|
|
| 2 |
C-07897 Paket 12 |
2009 |
MultiFab |
PT.PLN (PERSERO). |
Fabrication And Supply Tower 150kV TL from Wonosari - Wonogiri |
150 |
|
|
|
|
| 3 |
182.PJ/131/PIKITRI NG JBN/2008 |
2008 |
Consortium HGPT |
PT.PLN (PERSERO). |
Power Transmission Improvement Sector Project, Java-Bali Power Transmission System , 150kV Transmission Line Ungahan/Krapyak-Weleri, Dago Pakr Incomer, KOPO-Rangkasbitung (supply & Installation) - Packege B2 |
150 |
48 |
|
|
48 |
| 4 |
183.PJ/131/PIKITRI NG JBN/2008 |
2008 |
Consortium HGPT |
PT.PLN (PERSERO). |
Power Transmission Improvement Sector Project, Java-Bali Power Transmission System , 150kV Transmission Line Mandirancan-Ujungberong and Depok II-Kedung Badak (supply & Installation) - Packege B3 |
150 |
116 |
|
|
128 |
| 5 |
John Holland Project No 1615 |
2008 |
JOHN HOLLAND |
Transgrid, Australia |
Munmorah-Colongra Power Station Doublr Circuit 330kV TL |
330 |
|
|
|
|
| 6 |
022.PJ/131/PIKITRI NG JBN/2006 (IBRD Loan No. 4712-IND IFB - 3B |
2007 |
Consortium HGPT |
PT.PLN (PERSERO). |
Java Bali Power Sector Restructuring and Strengthening Project-Package IFB-3B for West Java & Jakarta |
150 |
66 |
|
|
69.9 |
| 7 |
022.PJ/131/PIKITRI NG JBN/2007 (IBRD Loan No. 4712-IND IFB - 6 |
2007 |
Consortium HGPT |
PT.PLN (PERSERO). |
Java Bali Power Sector Restructuring and Strengthening Project-Package IFB-6 for East |
150 |
3.5 |
|
|
|
| 8 |
C1.PJ/131/PIKITRI NGKAL/2005 (ADB Loan No. 1983-INO Package C1) |
2007 |
Consortium HGPT |
PT.PLN (PERSERO). |
150kV Transmission Line Barikin-Tanjung East Kalimantan |
150 |
60 |
|
|
62.38 |
| 9 |
Cherry Garden |
|
Electrix, Australia |
ElectraNet, Australia |
275kV & 132kV TL tower & Substation Landing at Gantry Structurer |
275/132 |
|
|
|
|
| 10 |
Para Brinkwarth Davenport (275kV Line Upgrade -F1910 & F1911) |
|
Electrix, Australia |
ElectraNet, Australia |
Site measurement design, development for waist extension & strengthening steel |
275 |
|
282 |
|
|
| 11 |
whyalla-Yadnarie-Pt. Lincoin (132kV Line Upgrade (F1910 & F1911) |
|
Electrix, Australia |
ElectraNet, Australia |
Site measurement design, development for waist extension & strengthening steel |
132 |
|
|
262 |
|
| 12 |
PGCB/BS/2/2004 |
2004 |
HGPT |
PGCB, Bangladesh |
|
132 |
|
|
34 |
34 |
| 13 |
PGCB/SC/02/2003 |
2003 |
HGPT |
PGCB, Bangladesh |
|
132 |
|
|
40 |
40 |
| 14 |
Power XXV |
1999 |
Consortium HGPT |
PT.PLN (PERSERO). |
|
150 |
150 |
|
|
|
| TOTAL |
|
443.5 |
|
336 |
382.28 |